Mistral Offshore
MISTRAL
Offshore Consulting
Offshore Vessel Estimator
Cable Lay & Rock Installation · v8.0 · Indicative Tool
⚓ CLV — Single
☷ CLV — Compare
🚢 Fleet Database
🪟 SRI — Scope
🚢 SRI — Single Vessel
🏢 SRI — By Company
🏆 SRI — All Companies
🚢
Select a vessel
Vessel & Project Inputs
Vessel Selection
Project Parameters
nautical miles
Auto-computed
Total Duration
days
Campaigns
loadout cycles
Cable Wt / Pole
t per pole
Total Project Cable
t total (all poles)
Estimated Cost
set day rate in Fleet tab
Schedule Breakdown
ActivityDays
Select vessel and configure inputs
Project Notes
Shared Project Parameters
Fleet Database
↻ Loading vessel database...
Enter vessel day rates (€/day). In Admin mode all fields are editable — including photos, specs, and notes. Dimensions sourced from MarineTraffic / official vessel brochures.
Photo Vessel # Type Owner IMO MMSI Built Flag LOA (m) Beam (m) Design Draft (m) AIS Draft (m) TT1 (t) TT2 (t) TT3 (t) Total (t) Max Comb. (t) Trifoil SLB SRI Cargo (t) Max Depth (m) IFP Load Rate (t/hr) Install Rate (t/hr) DP Class Transit Spd (kts) Photo URL Notes Day Rate (€/day)
✓ Day rates applied!
⛅ Rock Installation — Project Scope
Material & Fuel Costs

Rock purchase price per tonne (ex-quarry). Added to vessel day-rate cost to give total project cost. Fuel cost is prepared for future use.

Project Map
Project site Quarry Set site coordinates above to plot
Quarry Selection

Tick the quarries available for this project. Distances are auto-calculated from the site centre coordinates above (haversine × 1.15 routing factor). The tool selects the nearest accessible quarry per grade per campaign.

Campaigns & Berms

Each campaign is a distinct mob→work→demob cycle along a section of the route. Add berms to each campaign with up to 2 rock layers each.

Select a vessel
Vessel Selection
Campaign
Vessel Productivity Overrides

Leave blank to use fleet defaults (shown as placeholder). Override for scenario testing.

Cost Add-ons

Applied on top of vessel + material cost. Default 3%.

⚠ No campaigns defined yet — go to the RI — Scope tab to set up the project.
⚠ No campaigns defined yet — go to the SRI — Scope tab first.
⚠ No campaigns defined yet — go to the SRI — Scope tab first.